• about
  • about

high quality Low Price Anti-blocking agent

Short Description:

Anti-blocking agent SJ-1 product description The problem of oil well plugging is widespread. For the well blockage caused by the damage of oil and gas reservoirs in various oilfield operations, our company has developed an oilfield compound plugging agent through experiments and research….


  • FOB Price: US $0.5 - 9,999 / Piece
  • Min.Order Quantity: 100 Piece/Pieces
  • Supply Ability: 10000 Piece/Pieces per Month
  • Product Detail

    Product Tags

    Anti-blocking agent SJ-1

    product description

    The problem of oil well plugging is widespread. For the well blockage caused by the damage of oil and gas reservoirs in various oilfield operations, our company has developed an oilfield compound plugging agent through experiments and research.

     

    Mechanism of action

    Eliminates polyacrylamide (HPAM) gel particles, sulfate-reducing bacteria (SRB), saprophytic bacteria (TGB) and iron bacteria (IB) and sulfides by using the strong oxidizing and germicidal properties of chlorine dioxide and activator. The clogging caused by bacteria in the injection wells and injection wells near the well formation provides chemical additives for the oilfield to increase production and increase injection. The mechanism of compound plugging agent in oil field:

    Oxidative degradation polymer

     

    main feature

    ·Composite disintegration with surface active oil displacing agent

    ·Remove the blockage of oil layer gaps and provide preconditions for increasing production

    ·Good compatibility and practicality

    ·Using the technology of “solid chlorine dioxide + environmentally friendly solid activator”, it solves many problems such as secondary blockage of oil wells, equipment corrosion and environmental pollution caused by acid activation.

    · Pumping into the well is simple, safe and reliable, easy to operate

     

    Method of use and dosage

    ·Inject the pre-fluid 5~10T into the well through the casing

    · After the main agent and auxiliary agent are activated on the ground, the working fluid is generated and injected into the formation through the sleeve at one time.

    ·Inject the post-fluid 5~10T into the well through the casing (squeeze the plugging agent into the incident hole section after activation)

    ·Restore production after 4-12 hours of shut-in

    ·When wearing, take good work clothes, protective glasses, gloves and masks, pay attention to labor safety protection

     

    Packaging, transportation and storage

    ·Special bag (25kg/bag)

    · Avoid rain, moisture and damage during transportation

    · Strong corrosive during use to prevent burns

    ·Do not mix and store main and auxiliary reagents, be careful not to store and transport with acidic substances.

    ·The product should be stored in a clean, dry and ventilated place

     

     

    We are a professional manufacturer and supplier for chemical industrial surfactants with over 20 years experience in chemical synthesis. Offering free sample, you’re warmly welcomed to purchase our products with low prices.

    2

    4

    5


  • Previous:
  • Next:

  • Write your message here and send it to us